Since late 2018, Reddion has been involved in the EDGE Amsterdam West project, a large-scale redevelopment of a 1970s office building with a floor area of approximately 48,000 m². Commissioned by Bosman Bedrijven, Reddion is providing the complete ventilation and air conditioning system for this leading and sustainable office project.

Work began in August 2018. The main building is equipped with air ducts and ventilation components. Chilled ceilings with integrated supply grilles have been installed on several floors. Eight air handling units have been placed in the basement, which collectively provide the supply and exhaust of air to all floors via central shafts. Shared facilities, such as a kitchen and restaurant, have been created on the ground floor. In these areas, Reddion is responsible for hanging and insulating the air ducts, matching the intensive use and the desired level of comfort.

In addition to the main building, Reddion has also fully equipped the approximately 6,000 m² annex with ventilation and air conditioning systems. This annex, also known as the ‘ninth tower,’ is connected to the main building and features a mechanical room on the newly constructed top floor. The air handling unit has now been installed here and is being connected to the internal duct system.

Reddion worked on this project together with Bosman Bedrijven until the end of 2021. The result is a high-quality, sustainable, and healthy office building that meets the highest standards in technology, comfort, and ventilation.

“A sustainable office begins with a well-thought-out and reliable indoor climate.”

Project specifications

Location: Amsterdam
Client: Bosman Bedrijven BV
Status: Completed
Project Name: EDGE Amsterdam West
Market Segment: Commercial & Institutional Construction